CABINS:
COMPLETED minor repairs to doors,screens and Cabin 5.

OAKS LODGE:
INSTALLED kitchenette
Remaining work: Determine plan for basement improvements

SHOP:
SEALED gap in Attic
CORRECTED drainage problem
Remaining work: Continue interior & exterior cleanup

DORMITORY:
ENCLOSED HOLES in attic

WATERFRONT:
COMPLETED CLEANUP of lake shed and imporved storage of lifejackets
REMAINING WORK:
1- Raise level of dam where it is lower    Labor and $1,500.00 - $3,000.00
2-Install new overflow pipe     Labor and $3,000.00 - $4,000.00
3- Remove logs and debris that could block spillway    Labor
4- Repair edging on paddle boats
5- Mark rest of lake trail
6- Remove brush/trees from lower (water) side of dam
7- Remove brush and trees from face of dam

MISCELLANEOUS:
COMPLETED: purchase of gravel for entrance, purchase of camp tractor, Clean gutters on House & Dining Hall, move mattresses to cabins for summer season, clean Director’s House, got splitter and chipper running for cleanup work, replaced all cabin lights with compact florescents, replaced smoke detector batteries, Cleaned storage area below Pavilion and removed furniture from Oaks porch
REMAINING WORK:
- Build covers for firewood storage at fire pits   Labor and $300.00
- Construct road to meadow    Labor and $1,500.00 - $3,000.00
- Grade and re-seed meadow for use as a game field    Labor and $1,500.00 - $3,000.00
- Clear property of fallen limbs; down and split dead trees    Labor
- Purchase new round tables for dining hall    $2,000.00
- Construct Welcome Center/Guest House    $40,000.00

CHALLENGE COURSE:
- Seal all elements and replace any rotting posts

RETREAT for Pastors:
- Clean up outside firewood storage area
- Repair back deck    Labor and $500.00 - $1000.00
- Address any drainage/erosion concerns    Labor
- Route line for water supply    Labor and $1,500.00 - $3,000.00
- Install air conditioning    Labor and < $50.00

CABIN #9:
- Jack up and level floor before cabin becomes un-repairable
- Finish inside walls
- Build bunks